Load diversity factor pdf

If the individual loads do not occur simultaneously usually they do not, the diversity factor will be greater than unity. Thus, there is a diversity in the occurrence of the load. Load factor is defined as the ratio of average load to the maximum demand for a given period of time. Equipment load factors, use factors and diversity factors. Load factor it is the ratio of the average load to the maximum load for a certain period of time. Rated load factor, demand diversity factor, and coincidence factor are sometimes combined. Should actual voltages at motors be appreciably higher or lower than rated.

Thus mathematically, load factor may be written as load factor average load maximum demand load factor is generally calculated for a day, month or year. It is not the same as load diversity, and would not help in any service load or ampacity calculation. Demand factordiversity factorutilization factorload factor. In other articles applying to the calculation of loads in specialized. In one office or sleeping room i put 4 power sockets on a 32 amp ring circuit. Now, to calculate the total load of the office areato size the chillers, should i go with the peak load estimate or with the block load estimate. An introduction to electrical power requirements for. Another factor that designers consider is demand factor. Faktor beban load factor faktor beban adalah perbandingan antara beban ratarata selama interval tertentu dengan beban puncak yang terjadi pada interval yang sama. Load factor lf a ratio of the actual energy supplied in kwh over a period divided by the maximum demand in kw over. Power factor in electrical energy management course content what is power factor. Two simulations were performed and a difference of 7% was identified on the peak cooling load of the building with and without the use of diversity factors. This is especially the case with equipment loads, for which there is uncertainty about several factors.

To determine a kw demand limit for a percentage load factor desired, take the actual kwhs used by a home in a given month and divide by 720 total hours in an average 30day month. Diversity factor is also used in computer science and mathematics where it indicates the load. Sep 14, 2017 diversity factor varies from system to system and equipment. Impact of diversity factors on hvac load calculations. This is also known as peak coincidence factor nyserda 2008. A diversity of 70 percent indicates that a single system component operates at peak capacity 70 percent of the time, whereas a diversity factor of 1. As long as the load k factor is lower than the krating of the. Diversity factor in a distribution network is the ratio of the sum of the peak demands of the individual customers to the peak demand of the network. Determine the feederservice neutral calculated load per 220. Factors affecting selection, energy performance assessment of diesel conservation avenues 9.

In other words, we do not use all the loads at once at home i. For general industrial commercial facilities, there is precious little of either that the code recognizes. Faktor keragaman diversity factor faktor keragaman fdiv didefinisikan sebagai perbandingan antara jumlah beban maksimum dari masing masing unit beban. Diversity factor in electrical wiring installation.

Demand factordiversity factorutilization factorload. Diversity factor and peak load vs block load ps mechanical. A low load factor means that you are using electricity ine. Demand factordiversity factorutilization factorload factor 1 demand factor demand factor maximum demand of a system total connected load on the system demand factor is always less than one. Diversity factors c are a function of the number of living units served, and are provided in this section. A power transformer is connected to the following loads. In this study, the diversity factor was obtained by the actual power measured. May 15, 2018 now you are going to show you one practical example of diversity factor. Practical power cable ampacity analysis ced engineering. The ratio of the sum of the individual maximum demands of the various subdivisions of a system to the maximum demand of the whole system, i. It is the individual maximum demand load of a customers buildings unit usually occurring during the peak loading period either estimated or measured. If one has a low load factor it means that the customer has a very high peak load for a very short period.

Load factor is nothing but how well we utilize the energy, and it is the calculation of electrical energy utilization throughout a given time to the utmost energy which has been used in that time. Diversity factor is defined as the ratio of the sum of the maximum demands of the various part of a system to the coincident maximum demand of the whole system. The diversity factor is the most complicated of these factors. It covers preliminary load estimating factors, electrical power sources, and. Diversity factor sum of individual maximum demandsmaximum system demand. The residential load has the highest diversity factor. Would there be any diversity factors to be considered. Chapter three load curves the curve showing the variation. For this tutorial you should select example project ansi option when starting etap demo. A high load factor is a good thing, and a low load factor is a bad thing. It must be calculated from the connected load of that customers buildings multiply by the. Loss factor average power losspower loss at peak load.

Diversity can be said to be the inverse of the coincidence factor. The load factor is called daily load factor if the period of time is a day, and if the period of time is a month, the load factor is called monthly load factor, and similarly for the year load factor. Now you are going to show you one practical example of diversity factor. Diversity factor sum of individual maximum demands maximum system demand 1. Combined all safety factors for a grossly exaggerated load. For example, the sum of the connected loads supplied by a feeder is multiplied by the demand factor to determine the load for which the feeder must be sized. If there is a central laundry, calculate the additional. Table 4 lists usage factors, radiation factors, and load factors based on appliance energy consumption rate for typical electrical, steam, and gas appliances under standby or idle conditions. Pdf diversity factor analysis of energy consumption for school. Calculate the net computed demand load by applying the demand factor from table 220. For speeds lower or higher than those listed, efficiencies may be 1 to 3% lower or higher, depending on the manufacturer. This method was easy to evaluate the energy consumption by 80% load factor or diversity factor about 0. In the literature on diversity factors and load shapes, we covered papers.

Where the building is designed and constructed to comply with an energy code adopted by the local authority, the lighting load shall be permitted to be calculated at the values specified in the energy code. Capehart to do a good job on an energy audit, the energy auditor must understand the areas of equipment load factor, use factor and diversity factor. There are two terms that seem to confuse designers. Aug 25, 2018 the load factor provides an indication of how well any customer is utilising any utility asset. Diversity factor sum of individual maximum demandmaximum demand. For example, we might have ten air conditioning units that are 20 tons each at a facility. The load factor is called daily load factor if the period of time is a day, and if the period of time is a month, the load factor is called monthly load factor, and. Diversity factor is ratio of the sum of the individual maximum demands of the various sub circuit of a system to the maximum demand of the whole system.

Furthermore, there will be a brief look at the load flow result analyzer. To better understand the application of these terms when calculating the load for a service or a feeder supplying a facility, one must understand their meaning. Equipment load factors, use factors and diversity factors as well as a general discussion of energy audit procedures barney l. In such cases, in addition to eliminating the diversity factor, we recommend increasing the adjustment factor by multiplying the recovery demand by 1. What is diversity factor in electrical wiring installation. Diversity factors of 75% and 70% were applied to lighting and receptacle gains, respectively. Diversity factor is the ratio of the sum of the individual maximum demands of the various subdivisions of a system or part of a system to the maximum demand of the whole system or part of the system under consideration.

The load factor provides an indication of how well any customer is utilising any utility asset. Some conventiontype hotels are being designed to accommodate three or four people per room, using rollaway beds. Diversity factor and peak load vs block load hvacr. Comparing load duration curves with and without peak load. Introduction to electrical power requirements for buildings. Dg set system bureau of energy efficiency 165 syllabus diesel generating system. Diversity factor sum of individual maximum demands maximum demand of the system. If so, please advice me on how to choose the diversity factors.

What is an explanation for the calculation of a diversity. In the literature on diversity factors and load shapes, we covered papers reporting the existence of databases of monitored enduses. The design of the feeder and the substation accounts for the demand diversity factor, which. K factor can be a misleading power quality indicator philip j. I already mentioned in some other thread that art 220 of the nec and a few of its internal cross references, such as in 220. Where to use demand and diversity factor request pdf. Therefore the greater the level of diversity allowed in the system design, the lower the level. Details regarding the method that should be followed. The link provided in post 4 discusses demand factor and diversity factor. If everything all electrical equipment was running at full load at the same time the diversity factor is equal to one. The diversity factor is the reciprocal of the coincidence factor or equation.

Diversity factor the probability that a particular piece of equipment will come on at the time of the facilitys peak load. Put your presentation title or confidentiality info here. The diversified load is the total expected power, or load, to be drawn during a peak period by a device or system of devices. In other terms, diversity factor 0 to 100% is a fraction of total load that is particular item contributed to peak demand. The load factor is the ratio of the average load over a designated period of time, usually 1 year, to the maximum load occurring in that period or equation. The maximum demands of the individual consumers of a group do not occur simultaneously. If they were, then the 100a supply fuse would rupture, as it cannot pass 192a. The unit values herein are based on minimum load conditions and 100 percent power factor and may not provide. Demanddiversity factor value quick reference electrical. I am a yank electrician, i cant find where in 16th or 17th edition you have the diversity factor for calculating loads. Pdf diversity factor analysis of energy consumption for. You can convert the net computed demand load kva to amperes using the following formula.

Multifamily dwelling unit service and feeder calculations. Diversity factor varies from system to system and equipment. Residential township load forecasts focus on admd forecasting over a 15 to 20year period, which reflects the economic life of the plant. What is load factor definition, calculation, example. The maximum demand for the power transformer is kw. Load factor using load factor to determine demand limit. Greater the diversity factor, lesser is the cost of generation of power. Diversity factor or simultaneity factor is the ratio of the sum of the individual noncoincident maximum loads of various subdivisions of the system to the maximum demand of the complete system. Industrial loads have low diversity factors usually of 1. The sum of the individual peak loads will therefore inevitably be greater than the peak load of the composite system. Admd is used for mvlv transformer sizing and to calculate voltage drop over the lv feeders, service. Cable network usually forms a backbone of the power system. While this is analyzed and documented by laboratory planners during the programming phase of design, the actual quantity. Diversity factor analysis of energy consumption for school building.

Feb 27, 2020 the link provided in post 4 discusses demand factor and diversity factor. The ratio of average energy savings to peak energy savings. Normally, the energy consumption of school buil ding was simply calculated as shown in. The industrial load is 1500 kw, the domestic load is 100 kw and the municipal load is 50 kw. Pdf residential load models for network planning purposes. More generally, load factor is the average demand divided by any number of peak demands, such as load factor at the time of system peak and load factor at the time of noncoincident peak. Demand factors for buildings typically range between 50 and 80 % of the connected load. Demand diversity factor is the ratio of the peak demand of a population of units to. Load factor is calculated using a few simple numbers. Power factor is the percentage of electricity that is being used to do useful work.

Diversity factor is the ratio of the sum of the individual maximum demands of the various subdivisions of a system or. Diversity factor sum of individual maximum demands maximum system demand. It is defined as the ratio of active or actual power used in the circuit measured in watts or kilowatts w or. Electrical load diversity factor is a ratio representing the sum of the individual maximum demands for each part or parts of the system to the maximum demand of the entire system or parts of the system. Hence diversity factors df will be applied to the demand loads when calculating the required ampacity of service and feeder conductors, distribution. Running load flow analysis click the load flow analysis button on the mode toolbar to switch to load flow analysis mode. In a limited since, the apparent oversize this causes is a safety factor.

The purpose of this tutorial is to introduce the load flow analysis module, and provide. If everything all electrical equipment was running at full load at the same time the diversity factor is equal to one greater the diversity factor, lesser is the cost of generation of power. Typical load profiles of occupancy and internal loads lighting, office equipment for each defined daytype. Load forecasting load forecasting impacts on the whole network plan, as well as capital expenditure. Cooling load calculations and principles ced engineering. The ratio of the maximum coincident demand of a system, or part of a system, to the total connected load of the system, or part of the system, under consideration, i.

Pdf the energy conservation in thailand is concerned and supported. In a building, the whole load of electrical wiring installation doesnt use at the same time. Chapter three load curves the curve showing the variation of. Load factor average load maximum demand diversity factor the ratio of the sum of individual maximum demand on power station is known as diversity factor. Comparing load duration curves with and without peak load 3. Kfactor can be a misleading power quality indicator. Equipment load factors, use factors and diversity factors as. To illustrate the impact of diversity factors on peak building load, an energy simulation was performed on a 10,000 sq. These terms are diversity factor and demand factor. Residential load models for network planning purposes. In an industrial installation this factor may be estimated. The diversity factor is almost always larger than 1 since all components would have to be on simultaneously at full load for it to be one. If each individual load operated to its maximum extent simultaneously, the maximum demand for power would be equal to the connected load and the diversity factor would.

454 839 542 457 119 1130 21 842 942 994 1292 647 262 15 1008 488 243 369 336 712 1189 1076 1224 1067 99 1000 794 653 758 774 10 891 373 481 474 1245 277 455 671 499 1441 1124 653 327